Ruling: [We have seen that def are to pay for breach of contract, but the question now is whether the amount written in the contract is binding.]
Pl was damaged by breach of the franchise agreement by lost opportunity and unrewarded effort, but damage was only in the tens of thousands, not 150,000 NIS. Since the obligation was in def’s ability to control and the listed payment is exaggerated compared to damages, it is considered an asmachta (an obligation one took because he did not expect to have to pay it), which is generally not binding (Shulchan Aruch, Choshen Mishpat 328:1-2). Is this case one of the exceptions to that rule?
Tosafot (Bava Metzia 66a) gives two explanations why we honor penalty agreements for a broken engagement: 1. It is an accepted societal practice (along the lines of situmta). 2. The matter embarrasses the "victim." #2 indicates that the obligation may not be exaggerated. #1 is based on the idea that whereas asmachta lacks gemirut da’at (full consideration), if something is known to be binding, one who accepts it considered it well. Whether we accept distinction #1 may depend on the machloket cited in the Pitchei Teshuva (CM 201:2) whether situmta works to transfer an object that did not exist at the time of agreement. However, that might be a technical problem, for which situmta is less helpful (see Rav Elyashiv, Piskei Din Rabbaniim V, p. 265). Not only do the Rambam/Shulchan Aruch (CM 207:16) not accept Tosafot and require a different system to overcome asmachta, but the Rama (ad loc.), who accepts Tosafot, does so only based on the second distinction, not based on it being accepted practice.
While it is not simple to ignore the law of the land and local practice regarding monetary matters, Israeli law gives the courts the prerogative to decide whether to enforce penalty clauses to the fullest degree. Often, they do not. Instead of either accepting or rejecting the clause, it is reasonable to use it as a guide to figure damage based on a high estimation of what could be the damage even if it is not proven (see Pitchei Choshen, Kinyanim 21:(25)). This is an accepted approach in our batei din. In this case, we will also factor in that pl also did not carry out all the obligations he accepted. Therefore, we will set the amount that def have to pay for breach of contract at 25,000 NIS.

P'ninat Mishpat (809)
Beit Din Eretz Hemda - Gazit
691 - Who Breached the Contract? part 3
692 - Who Breached the Contract? – part IV
693 - Agent who Did Not Set Agent’s Fee
Load More

Beit Din Eretz Hemda - Gazit

Payments after a Gradual End of Employment
(Based on ruling 82024 of the Eretz Hemdah-Gazit Rabbinical Courts
Nissan 5783

Halachic Shmita Guide from Eretz Hemdah
Elul 8 5781

Connecting Disciplines in Torah Study
Igrot Hare’aya – Letters of Rav Kook 103 – part III
Sivan 15 5782

Profits from Formerly Joint Swimming Pool – part
(based on ruling 81110 of the Eretz Hemdah-Gazit Rabbinical Courts)
19 Sivan 5784

P'ninat Mishpat: Multiple Agreements and Parties – part III
based on appeal of ruling 80082 of the Eretz Hemdah-Gazit Rabbinical Courts
Beit Din Eretz Hemda - Gazit | Tevet 5786

P'ninat Mishpat:Amounts and Conditions of Payment to an Architect – part I
based on ruling 83061 of the Eretz Hemdah-Gazit Rabbinical Courts
Beit Din Eretz Hemda - Gazit | Iyar 5784

P'ninat Mishpat: Rent of an Apartment Without a Protected Room
based on ruling 84036 of the Eretz Hemdah-Gazit Rabbinical Courts
Beit Din Eretz Hemda - Gazit | Iyar 5784